Building Momentum: Summer Construction and Improvement Projects Progress at PPPS

High School Cafeteria Expansion

Progress on the cafeteria expansion project at Paw Paw High School is moving forward as planned. In addition to the foundation work, construction is underway on the new concrete block walls and the new door frame openings.


Two sets of double doors and two new single doors will connect the existing structure with the addition.


When completed, the cafeteria expansion will increase the cafeteria seating capacity from approximately 250 to 375 students, which will allow for fewer lunch periods and less disruption of learning.


Soccer Stadium Restroom Renovations

In addition to a fresh coat of paint, recent facility improvements to the men’s and women’s restrooms at the soccer stadium include: updated plumbing and plumbing fixtures, and a new moisture-resistant wall paneling.


Baseball Field Drainage System

The installation of the new drainage system at the high school baseball field is also underway!